๐Ÿ› ๏ธ HandsOnCoach
howto.support / diy.howto.support / How to Install Asphalt Roof Shingles
DIY & Home Improvement โšก Intermediate โฑ๏ธ 6-10 hours per 100 sq ft

How to Install Asphalt Roof Shingles

Learn how to lay underlayment, starter strips, and architectural asphalt shingles with proper staggering, nailing patterns, and ridge cap installation.

How to use this page
  1. Read the tools, materials, safety notes, and steps below for free.
  2. Tap Start Camera Coach when you want hands-free voice help.
  3. Allow camera and microphone. Point your phone at the work; the coach watches your progress and tells you the next step.
Real-Time AI Vision & Voice Coaching Ready
Point your phone at your work. The coach watches, checks each step, and warns you before a mistake costs you.
Start Camera Coach โ†’
Your first guide is free โ€” this one can be it.
Start the camera coach on this guide and it becomes your free one: 30 minutes of live coaching, no signup, no card. One free guide per person โ€” starting the coach here claims yours.
Coach this guide free โ†’
The guide is free. Live coaching is the paid part.
Reading, pausing and idle time never count โ€” only time the coach is actively watching.
$1.99
This guide only
3 hours of coaching, good for a year. Top up another 3 hours any time for $1.99.
Unlock this guide
$4.99 best for one project
All-Access, 30 days
Every guide, up to 15 hours โ€” 5ร— the coaching time of a single unlock for 2.5ร— the price, and you are not locked to one guide.
Get 30 days โ€” $4.99
$39.99
All-Access, 1 year
Every guide, up to 50 hours โ€” about 80ยข an hour, the cheapest way to coach if you build often.
Get a year โ€” $39.99
One-time PayPal payments โ€” nothing auto-renews. Want to try it first? Change a Flat Tire and Fix an Unsolvable Rubik's Cube are free to coach on, for everyone, forever.
Already bought? Restore your purchase.

๐Ÿงฐ Required Tools & Equipment

  • โœ“ Roofing nail gun or roofing hammer
  • โœ“ Chalk line reel
  • โœ“ Utility knife with hook blades
  • โœ“ Tape measure
  • โœ“ Pneumatic air compressor and hose
  • โœ“ Tin snips

๐Ÿ“ฆ Materials & Supplies

  • โœ“ Architectural asphalt shingles
  • โœ“ Starter strip shingles
  • โœ“ 1-1/4 inch galvanized roofing nails
  • โœ“ Drip edge flashing
  • โœ“ Self-adhering ice-and-water membrane
  • โœ“ Synthetic roofing felt underlayment

โš ๏ธ Safety Checkpoints & Warnings

๐Ÿ“‹ Step-by-Step Guide (6 Steps)

1

Install Drip Edge and Underlayment

Nail metal drip edge flush along the eaves first. Roll ice-and-water barrier along the bottom edge, extending past eaves by 1/4 inch, then roll synthetic underlayment over the remaining roof decking with 4-inch horizontal overlaps. Nail rake-edge drip edge on top of the underlayment along the roof sides.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Metal drip edge visible along all outer edges with underlayment neatly layered over eave metal and under rake metal.
  • โ€ข Underlayment lies completely flat without ripples or bubbles.
๐Ÿ›‘ Watch Out For
  • โ€ข Installing rake drip edge under the underlayment instead of over it.
  • โ€ข Leaving wrinkles in the underlayment that telegraph through shingles.
โš ๏ธ Safety Note: Do not walk on underlayment until it has been completely fastened down with plastic-capped roofing nails.
2

Snap Horizontal and Vertical Layout Lines

Measure up from the eave drip edge and snap a horizontal chalk line for the starter course, allowing a 1/2-inch shingle overhang. Snap horizontal reference lines every 4 or 5 courses (typically 5 inches per reveal) to keep rows straight across the entire roof plane. Snap vertical plumb lines every 3 feet to prevent drift.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Crisp blue or red chalk grid lines visible across the underlayment parallel to the eave and perpendicular to the rake.
๐Ÿ›‘ Watch Out For
  • โ€ข Measuring only from one corner without verifying parallel alignment at both roof ends.
โš ๏ธ Safety Note: Keep your center of gravity low and feet planted within your harness radius while stretching chalk lines.
3

Fasten Starter Strip Shingles

Align manufactured starter shingles along the eave edge with the adhesive sealant strip facing upward and positioned closest to the eave. Overhang the starter strip 1/2 inch beyond the drip edge at both the eave and the rake edges. Fasten with four roofing nails placed 2 to 3 inches above the bottom edge.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข A continuous black starter row extending along the entire bottom eave with a uniform 1/2-inch drip overhang.
๐Ÿ›‘ Watch Out For
  • โ€ข Installing the starter strip with the adhesive strip pointing toward the top instead of the eave.
  • โ€ข Placing starter strip end joints directly aligned with first-course shingle joints.
โš ๏ธ Safety Note: Ensure air compressor pressure is set to 90-100 PSI to avoid shooting nails through the shingle mat.
4

Lay First Course and Establish Stagger Pattern

Place a full shingle directly over the starter strip at the rake edge, flush with the starter's outer boundaries. Cut subsequent starter shingles for higher courses: cut 6 inches off the second course, 11 inches off the third, and 17 inches off the fourth (or follow manufacturer offset guidelines). Work diagonally upward in a stepped pattern to maintain standard 5 to 6-inch vertical joint offsets.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข A stepped, diagonal pyramid of shingles ascending from the rake edge with staggered vertical seams.
  • โ€ข No vertical butt joints aligned within 4 inches of the row below.
๐Ÿ›‘ Watch Out For
  • โ€ข Laying shingles straight up in vertical columns rather than staggering diagonally, leading to water tracks.
โš ๏ธ Safety Note: Clear shingle cut-offs immediately from your footing zone to prevent dangerous slip hazards underfoot.
5

Nail Shingles on the Manufacturer Fastener Line

Drive four nails per shingle (six in high-wind zones) directly into the designated nail line located between the asphalt laminate layers. Drive nails straight and flush with the surface without sinking the head through the shingle or leaving it proud. Position nails approximately 1 inch in from each edge and space the remaining nails evenly across the line.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Nail heads driven completely flat and flush with the shingle surface, exactly centered on the painted nail line.
  • โ€ข No nails exposed below the overlapping exposure zone of the next course.
๐Ÿ›‘ Watch Out For
  • โ€ข High-nailing above the manufacturer nail strip, which misses the double-layered reinforcing zone.
  • โ€ข Over-driving nails so the nail head punches completely through the fiberglass mat.
โš ๏ธ Safety Note: Never rest your free hand within 12 inches of the nail gun nosepiece while firing.
6

Cap the Ridge and Hip

Cut individual ridge cap pieces from 3-tab shingles or use pre-manufactured ridge caps. Bend each cap centered over the roof peak and fasten with two nails, one on each side, placed 1 inch from the edge and 5 inches up from the exposed end. Overlap caps continuously along the ridge toward the prevailing wind, finishing the final cap with two nails sealed under roofing cement.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข A uniform, centered capping strip running along the ridge peak with exact 5-inch exposure.
  • โ€ข The final two nails on the terminal cap covered neatly with asphalt roof cement.
๐Ÿ›‘ Watch Out For
  • โ€ข Installing ridge caps against the prevailing wind direction, allowing storm winds to catch underneath.
  • โ€ข Using standard 1-1/4 inch nails instead of longer 1-3/4 inch nails through multi-layer ridge peaks.
โš ๏ธ Safety Note: Straddling the ridge peak requires constant three-point contact and a securely anchored harness.

Credit: inspired by an original tutorial by This Old House โ€” watch the original on YouTube.

Don’t have everything?

More in DIY & Home Improvement