๐Ÿ› ๏ธ HandsOnCoach
howto.support / diy.howto.support / How to Install Drip Edge on a Roof
DIY & Home Improvement โšก Intermediate โฑ๏ธ 1 to 3 hours

How to Install Drip Edge on a Roof

Learn how to properly measure, cut, overlap, and fasten aluminum or steel drip edge along eaves and rakes to protect roof decking and fascia from water damage.

How to use this page
  1. Read the tools, materials, safety notes, and steps below for free.
  2. Tap Start Camera Coach when you want hands-free voice help.
  3. Allow camera and microphone. Point your phone at the work; the coach watches your progress and tells you the next step.
Real-Time AI Vision & Voice Coaching Ready
Point your phone at your work. The coach watches, checks each step, and warns you before a mistake costs you.
Start Camera Coach โ†’
Your first guide is free โ€” this one can be it.
Start the camera coach on this guide and it becomes your free one: 30 minutes of live coaching, no signup, no card. One free guide per person โ€” starting the coach here claims yours.
Coach this guide free โ†’
The guide is free. Live coaching is the paid part.
Reading, pausing and idle time never count โ€” only time the coach is actively watching.
$1.99
This guide only
3 hours of coaching, good for a year. Top up another 3 hours any time for $1.99.
Unlock this guide
$4.99 best for one project
All-Access, 30 days
Every guide, up to 15 hours โ€” 5ร— the coaching time of a single unlock for 2.5ร— the price, and you are not locked to one guide.
Get 30 days โ€” $4.99
$39.99
All-Access, 1 year
Every guide, up to 50 hours โ€” about 80ยข an hour, the cheapest way to coach if you build often.
Get a year โ€” $39.99
One-time PayPal payments โ€” nothing auto-renews. Want to try it first? Change a Flat Tire and Fix an Unsolvable Rubik's Cube are free to coach on, for everyone, forever.
Already bought? Restore your purchase.

๐Ÿงฐ Required Tools & Equipment

  • โœ“ Tin snips or aviation shears
  • โœ“ Hammer or roofing nail gun
  • โœ“ Tape measure
  • โœ“ Chalk line
  • โœ“ Pencil

๐Ÿ“ฆ Materials & Supplies

  • โœ“ Metal drip edge flashing (T-style or L-style)
  • โœ“ 1-1/4 inch galvanized roofing nails
  • โœ“ Roofing underlayment / ice and water shield

โš ๏ธ Safety Checkpoints & Warnings

๐Ÿ“‹ Step-by-Step Guide (6 Steps)

1

Install Eave Drip Edge Directly on Sheathing

Place the drip edge along the bottom eave directly against bare plywood decking before underlayment is laid. Align the flange flat on the deck with the vertical drop hanging down past the fascia board. Leave a 1/4 to 3/8 inch gap between the drop leg and the fascia board for water clearance.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Metal flashing sits flat against bare wooden decking along the lower roof line
  • โ€ข A small uniform air gap is visible between the vertical metal leg and the fascia board
๐Ÿ›‘ Watch Out For
  • โ€ข Placing eave drip edge on top of felt/underlayment instead of directly onto the plywood deck
  • โ€ข Pressing the vertical leg tight against the fascia, trapping runoff water
โš ๏ธ Safety Note: Keep footing stable on the ladder rung; do not overreach to the side.
2

Fasten the First Eave Length

Drive 1-1/4 inch galvanized roofing nails into the top horizontal flange every 12 to 16 inches. Stagger the nails slightly toward the center and top of the flange to avoid splitting the deck edge. Drive nails flush without crushing or denting the metal profile.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Nails seated flush every 12 to 16 inches along the top flange
  • โ€ข Metal strip lays flat without oil-canning or waves
๐Ÿ›‘ Watch Out For
  • โ€ข Nailing through the bottom edge too close to the fascia
  • โ€ข Over-driving nails and denting the drip edge
โš ๏ธ Safety Note: Watch for stray nail tips if working near exposed soffit overhangs.
3

Overlap Eave Seams

When joining two lengths along the eave, overlap the joints by 2 to 3 inches. Cut a 1-inch notch in the bottom kick-out hem of the overlapping piece so the two metal sections slide tightly inside one another without buckling. Nail through both layers at the overlap seam.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Seamless 2 to 3 inch overlap with flush seams
  • โ€ข No gaps or flared metal wings protruding at the joint
๐Ÿ›‘ Watch Out For
  • โ€ข Butting edges end-to-end without overlap
  • โ€ข Failing to snip the bottom hem, causing the joint to flare open
โš ๏ธ Safety Note: Wear cut-resistant gloves; freshly snipped metal corners are razor sharp.
4

Form Outside Eave Corners

Extend the eave drip edge 1 inch past the outside roof corner. Use tin snips to cut through the top horizontal flange and the downward drop down to the bend, then fold the 1-inch tab around the rake corner. This provides continuous water shedding around the edge.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข A neat 90-degree metal wrap around the outer corner of the fascia
  • โ€ข Single nail securing the wrapped tab flat to the rake decking edge
๐Ÿ›‘ Watch Out For
  • โ€ข Cutting drip edge perfectly flush with the corner, leaving bare wood exposed at the turn
  • โ€ข Cracking the metal by bending back and forth repeatedly
โš ๏ธ Safety Note: File or flatten any jagged metal burrs that could catch on safety ropes or clothing.
5

Install Rake Drip Edge Over Underlayment

Roll out roof underlayment or ice and water shield over the eave drip edge. Next, install rake drip edge running up the gable sloped sides ON TOP of the underlayment. Fasten every 12 to 16 inches, working from the bottom eave upward toward the roof ridge.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Underlayment is visible underneath the metal flange along the gable rake
  • โ€ข Rake drip edge overlaps the previously installed eave drip edge corner tab
๐Ÿ›‘ Watch Out For
  • โ€ข Putting rake drip edge underneath underlayment, allowing wind-driven rain under the edge
  • โ€ข Working from ridge down to eave, resulting in reverse laps
โš ๏ธ Safety Note: Maintain three points of contact when transitioning off the ladder onto the roof slope.
6

Cap the Peak Ridge Joint

Run the rake drip edge from both sides to meet at the roof peak. Cut one side flush with the peak angle, and let the opposite side run 1 to 2 inches past. Slit the horizontal flange of the overlapping piece, fold it over the ridge cap, and secure with a nail on each side.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Clean, symmetrical peak cap overlapping the roof ridge
  • โ€ข Both rake sides securely tied together at the top apex
๐Ÿ›‘ Watch Out For
  • โ€ข Leaving an open gap at the very peak of the roof
  • โ€ข Cutting both sides flush with no overlapping peak cover
โš ๏ธ Safety Note: Use a roof harness and anchor point when working at or near the roof ridge peak.

Credit: inspired by an original tutorial by Dylan Hodgson โ€” watch the original on YouTube.

Don’t have everything?

More in DIY & Home Improvement