How to Build a Mini 2-Story Villa with Water Slide
Construct an outdoor mini luxury villa featuring two-story brick masonry, a reinforced concrete plunge pool, and an integrated custom water slide.
- Read the tools, materials, safety notes, and steps below for free.
- Tap Start Camera Coach when you want hands-free voice help.
- Allow camera and microphone. Point your phone at the work; the coach watches your progress and tells you the next step.
๐งฐ Required Tools & Equipment
- โ Masonry trowel
- โ Trenching shovel
- โ Torpedo level
- โ Mortar mixing hoe and pan
- โ Measuring tape
- โ Rubber mallet
๐ฆ Materials & Supplies
- โ Red clay bricks
- โ Portland cement and fine sand
- โ Curved PVC pipe or fiberglass slide chute
- โ Waterproof pool sealant paint
- โ Steel reinforcing mesh (rebar wire)
- โ Plywood for slab formwork
โ ๏ธ Safety Checkpoints & Warnings
- โข Wear a particulate respirator and eye protection when pouring and mixing dry Portland cement.
- โข Wear heavy-duty rubberized gloves to prevent alkaline chemical burns from wet mortar.
- โข Ensure all earth trenches are firmly compacted before laying masonry to prevent structural shifting.
๐ Step-by-Step Guide (6 Steps)
Excavate Foundation and Pool Basin
Mark out a 6x8 foot perimeter for the villa and adjoining pool using stakes and string. Dig the foundation perimeter trench 8 inches deep and carve out the pool basin bowl to a depth of 14 inches. Tamp down the bare earth firmly across the entire excavated floor until solid.
- โข Crisp, flat-bottomed trench perimeter surrounding a recessed, cleanly carved pool bowl.
- โข Compacted soil showing no loose dirt mounds or crumbling sidewalls.
- โข Digging uneven trench depths that cause structural tilt.
- โข Skipping soil compaction, leading to cracked foundation slabs later.
Pour Footings and Pool Base Slab
Mix 1 part Portland cement to 3 parts fine sand with water to a thick, peanut-butter consistency. Lay steel reinforcing mesh across the bottom of the foundation trenches and pool basin. Pour a 3-inch layer of concrete over the mesh, smoothing it flat with a trowel while maintaining a gentle slope toward the pool drain.
- โข Uniform, grey concrete slab covering the base trenches and pool floor.
- โข Mesh completely embedded and invisible beneath the concrete surface.
- โข Mixing concrete too wet, which weakens the final cured strength.
- โข Allowing rebar mesh to rest directly on dirt instead of being suspended in concrete.
Lay First-Story Brick Walls and Pool Rim
Apply a 1/2-inch bed of mortar along the cured footing and lay the first course of bricks. Butter each brick end with mortar, press it firmly into place, and check alignment with a torpedo level. Build walls up 8 courses high, leaving framed openings for the front archway and the pool inlet.
- โข Plumb, level brick walls with neat, consistent 3/8-inch mortar joints.
- โข Clean, open rectangular or arched entrance voids in the lower wall.
- โข Failing to stagger vertical joints, causing vertical fault lines.
- โข Applying too much mortar, resulting in sagging or tilting brick lines.
Form and Cast Second-Story Floor Slab
Construct temporary wooden formwork supported by vertical props inside the first-story room. Lay a sheet of plywood flush with the top brick course, lay steel mesh over it, and pour a 2.5-inch reinforced concrete deck. Ensure the slab extends 4 inches past the wall to create an exterior cantilevered balcony.
- โข Smooth, horizontal concrete floor spanning the top of the lower walls.
- โข Rigid wooden support posts visible underneath holding the formwork firm.
- โข Under-supporting the plywood formwork, causing the fresh concrete deck to sag in the middle.
- โข Pouring the slab too thin near the balcony edge.
Erect Second Story and Slide Platform
Lay brick walls around the perimeter of the second-story slab to a height of 5 courses. Construct a dedicated raised tower platform on the pool-facing corner where the top of the water slide will anchor. Shape a miniature roof parapet and balcony railing using decorative brick patterns.
- โข Completed upper-level walls with open panoramic windows and a reinforced launch opening for the slide.
- โข Solid, level brick pedestal built at the upper slide entry point.
- โข Building upper walls out of alignment with the load-bearing lower walls.
- โข Leaving inadequate clearance for the slide chute anchor.
Install Water Slide, Plaster, and Waterproof
Anchor the curved slide chute from the second-floor launch pad down into the pool basin, embedding its base in concrete. Apply a 1/4-inch smooth finish plaster coat over all exposed brick and pool surfaces. Once fully dry, paint the pool basin and slide channel with two coats of waterproof pool sealant.
- โข Seamless plaster finish across all interior and exterior villa walls.
- โข Rigidly secured slide leading smoothly into a painted, watertight pool basin.
- โข Applying waterproof paint over damp or un-cured plaster, causing paint peeling.
- โข Leaving a sharp gap or ridge where the slide meets the pool water line.
Credit: inspired by an original tutorial by Mr. Building โ watch the original on YouTube.