howto.support / diy.howto.support / How to Pour Concrete Deck Footings
DIY & Home Improvement ⚡ Intermediate ⏱️ 4-6 hours

How to Pour Concrete Deck Footings

Dig, form, and pour durable concrete deck footings using cardboard building tubes and post anchors to create a stable foundation below the frost line.

Quick answer

This guide shows how to pour concrete deck footings in 4-6 hours. Start with dig footing holes below frost line; follow the safety notes and step checkpoints below.

Watch: How to Pour Concrete Deck Footings

Dig, form, and pour durable concrete deck footings using cardboard building tubes and post anchors to create a stable foundation below the frost line. · 3:10 minute walkthrough. The full written steps are below.

Visual step map

See the full sequence before you start, then check off each step as you go.

0 of 6 steps checked

Materials and cost planner

Select the items you plan to buy, adjust any estimated price, and calculate the selected total.

Editable rough U.S. retail estimates. Estimated all listed: $256.00. Prices are planning estimates, not quotes — tax, store, brand, size and quantity will change them.

Select the items you plan to buy, then calculate. The prefilled prices are rough estimates and can be edited.

Time and finish planner

Estimate active working time from the number of steps in this guide.

Estimated active time updates here.

Paint coverage calculator

Estimate how much paint to buy from the area you plan to cover, the number of coats and the coverage shown on the can.

Enter values to calculate.

Use the coverage printed on the actual product label. Rough, porous or heavily patched surfaces can use much more paint.

How to use this page
  1. Read the tools, materials, safety notes, and steps below for free.
  2. Tap See 20-second demo if you want to understand it first.
  3. Tap Start Camera Coach when you want hands-free help, or Voice-only if you do not want to use the camera.
  4. Allow camera and microphone. Point your phone at the work; the coach watches your progress and tells you the next step.
First coaching session free — no card, no signup
5 minutes of live coaching free. Point your phone at your work, or use voice-only if you prefer not to use the camera.
Start Camera Coach →
Your first guide is free — this one can be it.
Start the camera coach on this guide and it becomes your free one: 5 minutes of live coaching, no signup, no card. One free guide per person — starting the coach here claims yours.
Coach this guide free →
The guide is free. Live coaching is the paid part.
Reading, pausing and idle time never count — only time the coach is actively watching.
$1.99
This guide only
3 hours of coaching, good for a year. Top up another 3 hours any time for $1.99.
Unlock this guide
$4.99 best for one project
All-Access, 30 days
Every guide, up to 15 hours — 5× the coaching time of a single unlock for 2.5× the price, and you are not locked to one guide.
Get 30 days — $4.99
$39.99
All-Access, 1 year
Every guide, up to 50 hours — about 80¢ an hour, the cheapest way to coach if you build often.
Get a year — $39.99
One-time PayPal payments — nothing auto-renews. Want to try it first? Change a Flat Tire and Fix an Unsolvable Rubik's Cube are free to coach on, for everyone, forever.
Already bought? Restore your purchase.
Want this guide saved for later?
We will email the guide and three short coaching reminders. No spam, and you can unsubscribe at any time.
Know someone who could use this?
Send the guide to a friend who is about to tackle the same job.
Facebook LinkedIn X

🧰 Required Tools & Equipment

  • ✓ Post hole digger or power auger
  • ✓ Torpedo level or 2-foot spirit level
  • ✓ Wheelbarrow or heavy-duty mixing tub
  • ✓ Concrete hoe or flat shovel
  • ✓ Margin trowel
  • ✓ Tape measure

📦 Materials & Supplies

  • ✓ QUIKRETE 5000 or High Strength Concrete Mix
  • ✓ Cardboard building form tubes (Sonotubes)
  • ✓ Crushed gravel (base drainage)
  • ✓ Galvanized post base brackets or J-bolts
  • ✓ Clean water

⚠️ Safety Checkpoints & Warnings

📋 Step-by-Step Guide (6 Steps)

1

Dig Footing Holes Below Frost Line

Dig vertical holes at your layout markers using a post hole digger or auger. Ensure the hole depth extends at least 6 inches below your local frost line and has a flat, undisturbed soil base.

👁️ Camera AI Checkpoint
  • • Cylindrical hole with straight vertical sides
  • • Measuring tape shows bottom is below required frost depth line
🛑 Watch Out For
  • • Stopping before reaching local frost depth
  • • Digging a bowl-shaped bottom instead of flat
⚠️ Safety Note: Verify that all utility flags or markings are well clear of the excavation area.
2

Add Gravel Base and Cut Form Tubes

Pour 4 to 6 inches of crushed gravel into the bottom of the hole and tamp it firm. Measure the remaining depth, add 2 to 3 inches for above-ground clearance, and cut the cardboard form tube with a hand saw.

👁️ Camera AI Checkpoint
  • • Even layer of crushed stone visible in the hole bottom
  • • Form tube cut squarely to the calculated height
🛑 Watch Out For
  • • Skipping the gravel base, leading to drainage issues
  • • Cutting the tube too short so the top sits below ground grade
⚠️ Safety Note: Wear dust protection if cutting fiberboard tubes in an enclosed area.
3

Set, Plumb, and Backfill the Form Tube

Lower the tube into the hole and place a level against the side. Backfill soil tightly around the outside of the tube in layers, checking plumb continuously to keep it perfectly vertical.

👁️ Camera AI Checkpoint
  • • Spirit level bubble centered on two perpendicular sides of the tube
  • • Firm soil packed around tube perimeter with no gaps
🛑 Watch Out For
  • • Backfilling all at once, which pushes the tube out of plumb
  • • Leaving air voids around the tube
⚠️ Safety Note: Keep hands clear of pinching edges when compacting earth around the tube.
4

Mix the Concrete

Empty concrete mix bags into a wheelbarrow and form a depression in the center. Add clean water incrementally, pulling dry mix inward with a hoe until it reaches a uniform, thick oatmeal consistency.

👁️ Camera AI Checkpoint
  • • Uniform grey color with no dry powdery pockets
  • • Mixture holds its shape when sliced with a hoe without pooling water
🛑 Watch Out For
  • • Dumping all water at once, creating a runny soup
  • • Leaving unmixed dry aggregate in the corners
⚠️ Safety Note: Concrete is caustic; wear safety glasses and waterproof gloves to avoid chemical dermatitis.
5

Pour and Consolidate Concrete in the Form

Shovel concrete into the tube in 10-to-12-inch lifts. Consolidate each lift by rodding with a piece of rebar or tapping the tube exterior with a rubber mallet to eliminate trapped air voids.

👁️ Camera AI Checkpoint
  • • Concrete filling form evenly to the top rim
  • • Air bubbles rising and popping on the surface during rodding
🛑 Watch Out For
  • • Pouring the entire depth at once without rodding, trapping large voids
  • • Splashing mix onto the inner dry tube walls
⚠️ Safety Note: Support the wheelbarrow firmly so it does not tip toward you when shoveling.
6

Screed Top and Embed Post Bracket

Screed the wet concrete flush with the top of the form tube using a scrap board or margin trowel. Immediately center the J-bolt or post base bracket into the wet concrete, leaving the bottom plate flat on the surface.

👁️ Camera AI Checkpoint
  • • Smooth, flat concrete top flush with the cardboard rim
  • • Post bracket centered on layout lines and leveled horizontally
🛑 Watch Out For
  • • Sinking the post bracket too deep, embedding the wood standoff plate
  • • Inserting the bracket after concrete has begun its initial set
⚠️ Safety Note: Do not touch fresh concrete surface with bare hands during troweling.

Credit: inspired by an original tutorial by QUIKRETE — watch the original on YouTube.