How to Build a Retaining Wall

Construct a durable concrete block retaining wall with a level gravel foundation, embedded base course, integrated drainage pipe, and securely glued capstones.

Quick answer

This guide shows how to build a retaining wall in 1-2 days. Start with excavate the base trench; follow the safety notes and step checkpoints below.

Visual step map

See the full sequence before you start, then check off each step as you go.

0 of 6 steps checked

Materials and cost planner

Select the items you plan to buy, adjust any estimated price, and calculate the selected total.

Editable rough U.S. retail estimates. Estimated all listed: $289.00. Prices are planning estimates, not quotes — tax, store, brand, size and quantity will change them.

Select the items you plan to buy, then calculate. The prefilled prices are rough estimates and can be edited.

Time and finish planner

Estimate active working time from the number of steps in this guide.

Estimated active time updates here.

Paint coverage calculator

Estimate how much paint to buy from the area you plan to cover, the number of coats and the coverage shown on the can.

Enter values to calculate.

Use the coverage printed on the actual product label. Rough, porous or heavily patched surfaces can use much more paint.

How to use this page
  1. Read the tools, materials, safety notes, and steps below for free.
  2. Tap See 20-second demo if you want to understand it first.
  3. Tap Start Camera Coach when you want hands-free help, or Voice-only if you do not want to use the camera.
  4. Allow camera and microphone. Point your phone at the work; the coach watches your progress and tells you the next step.
First coaching session free โ€” no card, no signup
5 minutes of live coaching free. Point your phone at your work, or use voice-only if you prefer not to use the camera.
Start Camera Coach โ†’
Your first guide is free โ€” this one can be it.
Start the camera coach on this guide and it becomes your free one: 5 minutes of live coaching, no signup, no card. One free guide per person โ€” starting the coach here claims yours.
Coach this guide free โ†’
The guide is free. Live coaching is the paid part.
Reading, pausing and idle time never count โ€” only time the coach is actively watching.
$1.99
This guide only
3 hours of coaching, good for a year. Top up another 3 hours any time for $1.99.
Unlock this guide
$4.99 best for one project
All-Access, 30 days
Every guide, up to 15 hours โ€” 5ร— the coaching time of a single unlock for 2.5ร— the price, and you are not locked to one guide.
Get 30 days โ€” $4.99
$39.99
All-Access, 1 year
Every guide, up to 50 hours โ€” about 80ยข an hour, the cheapest way to coach if you build often.
Get a year โ€” $39.99
One-time PayPal payments โ€” nothing auto-renews. Want to try it first? Change a Flat Tire and Fix an Unsolvable Rubik's Cube are free to coach on, for everyone, forever.
Already bought? Restore your purchase.
Want this guide saved for later?
We will email the guide and three short coaching reminders. No spam, and you can unsubscribe at any time.
Know someone who could use this?
Send the guide to a friend who is about to tackle the same job.
Facebook LinkedIn X

๐Ÿงฐ Required Tools & Equipment

  • โœ“ Shovel
  • โœ“ Torpedo level
  • โœ“ 4-foot level
  • โœ“ Hand tamper
  • โœ“ Rubber mallet
  • โœ“ Caulk gun
  • โœ“ Wheelbarrow

๐Ÿ“ฆ Materials & Supplies

  • โœ“ Interlocking retaining wall blocks
  • โœ“ Crushed leveling gravel (paver base)
  • โœ“ Drainage aggregate (crushed 3/4-inch angular stone)
  • โœ“ Perforated 4-inch drain pipe
  • โœ“ Non-woven landscape filter fabric
  • โœ“ Concrete retaining wall adhesive
  • โœ“ Retaining wall cap stones

โš ๏ธ Safety Checkpoints & Warnings

๐Ÿ“‹ Step-by-Step Guide (6 Steps)

1

Excavate the Base Trench

Dig a trench along your marked layout line roughly twice the width of a wall block. Make the depth equal to 4 to 6 inches for the gravel base plus an additional 1 to 2 inches to bury the bottom portion of the base block course. Clear out all loose soil and square off the bottom.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข A flat-bottomed, straight-sided trench clear of loose dirt and roots.
  • โ€ข Trench depth uniformly matches the target base depth along the entire layout line.
๐Ÿ›‘ Watch Out For
  • โ€ข Digging too shallow and leaving the base course resting above finished ground level.
  • โ€ข Creating a V-shaped trench instead of flat, horizontal bottom.
โš ๏ธ Safety Note: Check for shallow buried irrigation lines or landscape lighting cables before forceful shovel strikes.
2

Add and Compact the Gravel Base

Pour crushed paver base into the trench in 2-inch layers. Moisten the gravel lightly with water and pound it repeatedly with the hand tamper until fully solid. Check the compacted surface with a 4-foot level in all directions before adding subsequent layers up to a 4-6 inch total depth.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Tightly packed, grey gravel bed across the full trench width.
  • โ€ข Level bubble perfectly centered when 4-foot level is placed along and across the base.
๐Ÿ›‘ Watch Out For
  • โ€ข Pouring 6 inches of gravel at once without compacting in progressive thin lifts.
  • โ€ข Compacting dry gravel, which fails to bind properly.
โš ๏ธ Safety Note: Keep feet clear of the heavy iron tamper plate during downward strokes.
3

Lay and Level the Base Course

Place the first block at the lowest end of the trench. Use a torpedo level to check that the block is level front-to-back and side-to-side, tapping high corners with a rubber mallet. Set adjacent blocks tightly edge-to-edge, checking level across multiple blocks with the 4-foot level.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Base course of blocks aligned tightly end-to-end with no gaps.
  • โ€ข Level vial bubbles dead-center both along individual blocks and across multiple block tops.
๐Ÿ›‘ Watch Out For
  • โ€ข Accepting a 'close enough' slightly tilted block on the base layer.
  • โ€ข Leaving sand or gravel grit on top of blocks before checking level.
โš ๏ธ Safety Note: Keep fingertips away from block bottom edges while dropping them into the tight trench.
4

Install Landscape Fabric and Drain Pipe

Drape non-woven landscape filter fabric across the back of the base course, extending it up the excavated dirt embankment with excess fabric draped over the top. Place a 4-inch perforated drain pipe directly behind the base blocks with the holes facing downward. Pour angular crushed gravel directly over the pipe.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Black or grey fabric lining the soil wall behind the blocks.
  • โ€ข Perforated pipe resting flat at the base behind the wall, surrounded by clean angular stone.
๐Ÿ›‘ Watch Out For
  • โ€ข Placing the drain pipe holes pointing upward, preventing ground water from entering low.
  • โ€ข Omitting filter fabric, causing backfilled soil to clog the drainage rock over time.
โš ๏ธ Safety Note: Wear safety glasses when shoveling coarse, angular drainage gravel to avoid rock chips.
5

Stack Consecutive Courses with Offset Seams

Sweep the top surface of the lower course completely clean of dirt and debris. Place the next course of blocks so that vertical joints are offset (staggered like running bond brickwork) from the layer below. Backfill the space behind the blocks with crushed drainage stone after each course is placed.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Vertical seams centered over the middle of the blocks directly underneath.
  • โ€ข Clean aggregate gravel filled flush behind each newly laid course.
๐Ÿ›‘ Watch Out For
  • โ€ข Aligning vertical seams directly on top of one another, which compromises structural strength.
  • โ€ข Backfilling with clay or native soil instead of free-draining angular stone.
โš ๏ธ Safety Note: Pinch hazard: Set blocks down by their front and back faces, not by their sides where adjacent blocks touch.
6

Adhere Cap Stones and Complete Backfill

Fold the top flap of landscape fabric forward over the top of the gravel backfill layer. Sweep the top row of wall blocks clean and apply two thick beads of concrete adhesive. Set the cap stones firmly into the glue, align their overhang evenly along the front edge, and cover the folded fabric with native topsoil.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Uniform cap stone overhang along the entire top edge of the wall.
  • โ€ข Fabric completely enclosing the gravel drainage column beneath a layer of topsoil.
๐Ÿ›‘ Watch Out For
  • โ€ข Applying adhesive on dirty, dusty block tops, which prevents bonding.
  • โ€ข Letting cap stones set out of alignment before the adhesive cures.
โš ๏ธ Safety Note: Avoid skin contact with heavy-duty masonry adhesive; wash immediately with soap and water if exposed.

Credit: inspired by an original tutorial by Lowe's Home Improvement โ€” watch the original on YouTube.