How to Dig Post Holes and Frame a Deck

Dig post footings, set support posts in concrete, and assemble the primary ledger, beams, and joist framework for a sturdy deck base.

How to use this page
  1. Read the tools, materials, safety notes, and steps below for free.
  2. Tap Start Camera Coach when you want hands-free voice help.
  3. Allow camera and microphone. Point your phone at the work; the coach watches your progress and tells you the next step.
Real-Time AI Vision & Voice Coaching Ready
Point your phone at your work. The coach watches, checks each step, and warns you before a mistake costs you.
Start Camera Coach โ†’
Your first guide is free โ€” this one can be it.
Start the camera coach on this guide and it becomes your free one: 30 minutes of live coaching, no signup, no card. One free guide per person โ€” starting the coach here claims yours.
Coach this guide free โ†’
The guide is free. Live coaching is the paid part.
Reading, pausing and idle time never count โ€” only time the coach is actively watching.
$1.99
This guide only
3 hours of coaching, good for a year. Top up another 3 hours any time for $1.99.
Unlock this guide
$4.99 best for one project
All-Access, 30 days
Every guide, up to 15 hours โ€” 5ร— the coaching time of a single unlock for 2.5ร— the price, and you are not locked to one guide.
Get 30 days โ€” $4.99
$39.99
All-Access, 1 year
Every guide, up to 50 hours โ€” about 80ยข an hour, the cheapest way to coach if you build often.
Get a year โ€” $39.99
One-time PayPal payments โ€” nothing auto-renews. Want to try it first? Change a Flat Tire and Fix an Unsolvable Rubik's Cube are free to coach on, for everyone, forever.
Already bought? Restore your purchase.

๐Ÿงฐ Required Tools & Equipment

  • โœ“ Post-hole digger or power auger
  • โœ“ 4-foot bubble level
  • โœ“ Circular saw
  • โœ“ Cordless impact driver
  • โœ“ Tape measure
  • โœ“ Speed square
  • โœ“ Clamps

๐Ÿ“ฆ Materials & Supplies

  • โœ“ Pressure-treated 4x4 or 6x6 posts
  • โœ“ Pressure-treated 2x8 or 2x10 framing lumber
  • โœ“ Quick-setting concrete mix
  • โœ“ Structural joist hangers and framing screws
  • โœ“ Gravel for drainage

โš ๏ธ Safety Checkpoints & Warnings

๐Ÿ“‹ Step-by-Step Guide (6 Steps)

1

Dig Footing Holes Below Frost Line

Use a post-hole digger or auger to dig vertical holes at each marked layout point. Clear loose dirt from the bottom of each hole and pour in 4 to 6 inches of gravel for drainage. Check depth with a tape measure to verify it meets local frost-depth codes.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Clean, circular hole with flat bottom lined with gravel.
  • โ€ข Tape measure confirms target depth below frost line.
๐Ÿ›‘ Watch Out For
  • โ€ข Digging shallow holes that sit above the frost line.
  • โ€ข Leaving loose, unpacked soil at the base.
โš ๏ธ Safety Note: Keep footing stable around the hole edge to avoid cave-ins while operating an auger.
2

Set and Plumb Support Posts

Place posts into the holes on top of the gravel base. Secure two 2x4 temporary diagonal braces per post using stakes driven into the ground. Adjust until the bubble level shows true vertical on two adjacent faces.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Posts stand upright with two diagonal 2x4 braces anchored to ground stakes.
  • โ€ข Level bubble is centered on two adjacent 90-degree sides of each post.
๐Ÿ›‘ Watch Out For
  • โ€ข Only checking level on a single side.
  • โ€ข Using loose stakes that wobble under light hand pressure.
โš ๏ธ Safety Note: Watch hands and fingers when securing braces against the post body.
3

Pour and Cure Concrete Footings

Mix quick-setting concrete according to package directions and pour around each post. Tamp with a scrap piece of wood to eliminate air pockets, then slope the surface slightly away from the wood to shed water. Allow to cure per manufacturer instructions before removing braces.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Concrete filled up to ground level with a slight crown around the post.
  • โ€ข Post remains firmly plumb after pouring.
๐Ÿ›‘ Watch Out For
  • โ€ข Adding too much water, weakening the cured concrete.
  • โ€ข Leaving the top flat or dished so water pools against the post.
โš ๏ธ Safety Note: Wear nitrile-coated gloves; wet concrete causes chemical skin burns.
4

Cut Posts and Mount Support Beams

Mark the finished beam height on each post using a level line from the ledger board. Cut the posts to height using a circular saw, then set doubled support beams across the posts. Secure beams to posts using structural post caps or heavy-duty through-bolts.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Beams sit flat across post tops or notches, clamped tight.
  • โ€ข A 4-foot level laid across the beam shows perfectly flat and level.
๐Ÿ›‘ Watch Out For
  • โ€ข Cutting posts at an angle instead of a square, flat plane.
  • โ€ข Fastening standard screws instead of approved structural hardware.
โš ๏ธ Safety Note: Support both ends of heavy beams with clamps before fastening to prevent dropped lumber.
5

Install Rim Joists and Square the Frame

Fasten the outer rim joists to the ledger and beam ends to create the perimeter box. Measure diagonally from corner to corner in both directions; adjust the frame until both diagonal measurements match exactly. Lock the corners using structural corner brackets.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Outer rectangular frame fully closed with tight butt joints at corners.
  • โ€ข Corner-to-corner diagonal tape measurements read identical numbers.
๐Ÿ›‘ Watch Out For
  • โ€ข Proceeding with interior joists before squaring the outer box.
  • โ€ข Relying solely on visual alignment rather than measuring diagonals.
โš ๏ธ Safety Note: Keep footing clear of ground-level framing members to prevent trip hazards.
6

Hang Field Joists on 16-Inch Centers

Mark joist layouts every 16 inches on center along the ledger and outer rim joist. Fasten joist hangers using structural connector screws, slide joists into place, and secure through all hanger nail holes. Check that joist tops remain flush across the entire deck surface.

๐Ÿ‘๏ธ Camera AI Checkpoint
  • โ€ข Joists run parallel across the frame spaced evenly at 16 inches on center.
  • โ€ข All joist hanger holes are filled with designated structural screws.
๐Ÿ›‘ Watch Out For
  • โ€ข Spacing joists from inside-edge to inside-edge instead of center-to-center.
  • โ€ข Skipping screw holes on metal joist hangers.
โš ๏ธ Safety Note: Do not walk on unfastened field joists; step only on secured beams or stable ground.